The Salak South bridge at Jalan 9 damaged by heavy rain on 13-4-08.
A complaint was lodged by DAP Salak South on the Kampung Baru Salak Selatan Jln 9 bridge which was damaged on 13th of April 2008 by heavy rain.DBKL started work on 2nd of May 2008 and the bridge is now accessible to traffic. A press conference was called by YB Teresa Kok,the MP for Seputeh on 10th May 2008 to announce the opening of the road.
No comments:
Post a Comment